The Usibelli Story

Usibelli Coal Mine, Inc. (UCM) is a third generation, family-owned, business and the only operational coal mine in Alaska. Emil Usibelli founded the company in 1943. His son, Joe Usibelli is the Chairman of the Board of Directors. Joe Usibelli Jr., Emil's grandson, is President of UCM.

Mining began in Healy in the early 1900s in an area known as Suntrana. An abundance of naturally exposed outcroppings of coal seams is highly visible and resulted in the Alaskan pioneers tunneling directly into the coal seams to secure fuel for steam driven riverboats and the railroad. Underground mining operations began to prosper in the Suntrana area. Many of these historic mine sites are located in the Healy Creek Valley.

Emil Usibelli was an Italian immigrant who came to Alaska in 1935. He worked as an underground miner in the Evans Jones Mine near Palmer in the Matanuska Valley. A year later, he moved to Suntrana and worked underground for the Healy River Coal Company. After being laid off due to injuries sustained while mining, Emil started a logging operation and supplied timbers to the Suntrana Mine.

During World War II, Ladd Army Air Field in Fairbanks became an important military base. To reduce its dependency on a single fuel supplier, the military began exploration work on military coal reserves east of the Suntrana mines in an area known as the Healy Creek Valley. Emil Usibelli was hired to do that exploration work.  In 1943, Emil and a friend Thad Sandford decided to go into the coal mining business.  They were among several others who obtained coal leases from the U.S. Army. With a one-year contract to supply 10,000 tons of coal to the U.S. Army's Ladd Army Air Field (known today as Fort Wainwright U.S. Army post), Emil began operations with a small International TD-40 dozer and a converted GMC logging truck.  The dozer was used to push the overburden off the coal outcrops and then push the exposed coal into the truck bed. His methods of mining were viewed with skepticism by the underground miners but he met his contract obligations.

Emil's surface mining operation was a success. In 1948, he bought his partner's share of the business and Usibelli Coal Mine was incorporated under the laws of the Territory of Alaska. Emil persevered through tough times in the early years of the business, upgrading equipment and facilities while working to make his surface mining methods more efficient and cost effective. During the 1950s, UCM gradually increased its share of the military's growing coal demand and in 1954 began its first commercial sales to utilities in the Fairbanks area. In 1961, UCM purchased the neighboring Suntrana Mining Company (the successor to the Healy River Coal Company) and with that purchase Emil became the predominant supplier to the military and to Fairbanks area utilities.
During the 1950s and into the early 1960s, Usibelli operated both surface and underground mines.  As underground coal near the surface became more difficult to produce, the company decided it was both safer and more economical to mine from the surface. UCM has conducted surface mining operations exclusively since 1962.

During March 1964, Joe Usibelli at the age of 25 returned from graduate studies in mechanical engineering at Stanford University to take over management of mining operations in the community of Usibelli, Alaska.  Joe remained President and leader of the company until 1 August 1987 when his son Joe Jr. took the helm as President. Joe Usibelli currently serves as Chairman of the Board of Directors.
Construction of Golden Valley Electric Association’s (GVEA) mine mouth coal burning power plant was complete in 1967. GVEA Unit #1 is a 25-megawatt plant.

In 1971, UCM purchased the neighboring Vitro Mine and became the sole producing coal mine in Alaska.

During the late 1970s, UCM began the process of moving operations from the Healy Creek valley to the Poker Flats area in the Hoseanna Creek Valley. In Poker Flats, three seams of coal were mined: seam numbers 6, 4 and 3. The seams are numbered from the bottom up. The other coal seams are not mined, either because of their extreme depth below the surface or because the seams are not thick enough to be of economic value.

Adjacent to GVEA Healy Unit #1 is the Healy Clean Coal Project (HCCP). This new plant is the result of a nationwide competition sponsored by the U.S. Department of Energy to test new technologies that will help solve the international problem of acid rain. General construction of the power plant began in May 1995 and was completed on 21 November 1997. Coal firing start-up and the demonstration testing phase, required under the federal grant provisions, began in January 1998 and comprised of several test series, including performance guarantee acceptance tests, environmental compliance tests, major system characterization tests, integrated system commercial operating condition tests and the collection of commercial operating data. During demonstration testing from January 1998 through December 1999, GVEA purchased approximately 419,000 megawatt hours (Mwh) of electricity from HCCP. Alaska Industrial Development and Export Authority (AIDEA) administered the state funds and was designated the project owner. Under the original agreement GVEA was to operate the facility and pay for power generated. Usibelli Coal Mine, Inc. would furnish coal to HCCP. TRW and Babcock & Wilcox were the technology suppliers. H.C. Price Company was the general construction contractor. The purpose of the Healy Clean Coal Project was to demonstrate an environmentally sound technology for burning waste coal, to create additional energy generation to serve Interior Alaska and to demonstrate the attractiveness of Alaska coal in combination with modern combustion technology for overseas markets. The plant has remained dormant since 1999 as a result of a legal dispute between AIDEA and GVEA.

In 1997, UCM began work in an area known as Two Bull Ridge.

UCM's dragline moved its last load of overburden in Poker Flats Mine on 18 November 2002 and mining began in the Two Bull Ridge area, mining the same three seams of coal. It was no small feat for the dragline to "walk" a distance of two-and -a-half miles from Poker Flats to Two Bull Ridge. The dragline has moved more than 144 million bank (in situ) cubic yards of dirt and exposed 29 million tons of coal since 8 November 1978, when the dragline was first put into production in Poker Flats.  As a comparison, this volume is equal to covering 81,322 football fields with one foot of dirt.

The dragline started the journey from Poker Flats on 18 November 2002 and arrived at Two Bull Ridge Mine five days later on 22 November 2002. It walked a distance of approximately 13,175 feet and took a total of 2015 steps in 29.3 hours of walking for an average of 1.1 minutes per step. Each dragline step covered approximately 6.5 feet.

Gold Run Pass Mine is located 14 miles east of Poker Flats and Two Bull Ridge and has been in production for many years. It was a transition area as operations moved from the Healy Valley to Hoseanna Creek Valley.

The three seams of coal that UCM mines extend about 300 feet below the surface.  The coal seams range between 20 and 40 feet thick, and the overburden and interburden range from 60 to 150 feet thick.

Both overburden and coal can be very difficult to excavate. Explosive blasting is done in order to loosen both materials before they are handled by the "yellow iron" machinery. UCM utilizes a mixture of ammonium nitrate and diesel fuel which is transported, mixed and loaded into each drill hole by a specially designed explosive-powder truck. An explosive sequence can include from 20 to 400 holes in a blast.

In some areas of the pit, a technique introduced in 1982 called "cast blasting" is used to help remove overburden. During a cast blast, the drill holes and explosive charges are designed so that a portion of the overburden is "cast" laterally by the force of the explosion throwing the material into the adjacent mined-out pit. This technique, when it can be used, reduces about a quarter of the amount of overburden that the dragline must handle.

The current rate of coal production at the mine in Healy is approximately 1.5 million tons of coal per year. Coal is delivered to six Interior Alaska electrical generation power plants - including three military sites: Fort Wainwright (U.S. Army), Eielson Air Force Base, and Clear Air Force Station; Golden Valley Electric Association - Fairbanks' electric cooperative; Aurora Energy, LLC - a wholesale supplier of electricity and provider of district heat in Fairbanks; and the University of Alaska Fairbanks' power plant. UCM exported approximately 750,000 tons annually to South Korea through the Seward Coal Terminal at the Port of Seward from 1984 to 2002. In 2003 UCM began shipping 400,000 metric tons of coal each year during a two-year period to Honam, South Korea. In 2006, UCM began a contract to deliver 500,000 tons per year for a three year period. During 1998, a 20,000-ton shipment of UCM coal was delivered to Magadan in the Russian Far East. Additionally, UCM has provided test shipments to Taiwan and Japan. Since 2004 UCM has provided shipments of more than 500,000 tons of coal to Chile. The business arrangement was with Glencore, Ltd., a well-known international coal trading company.

The Bucyrus-Erie 1300W walking dragline, named by local school children when it began operations at Poker Flats Mine, is affectionately called "Ace-In-The-Hole." The dragline is the largest piece of equipment at the mine and the largest land mobile machine in Alaska. Its sole purpose is to remove overburden, the sandstone and clay or "dirt" that lies on top of the coal seams. Purchased during 1977, it was brought to Alaska on 26 railroad cars and 40 trucks. Once on site in Healy it took 11 months to reassemble and construct. The dragline consists of a 225-foot mast and a 325-foot boom. The total weight of the dragline is more than 4 million pounds or 2,100 tons of iron. The buckets used on the dragline will hold 33 to 42 cubic yards of material and can scoop material 150 feet below the base and deposit it 150 feet above the base. With a 90 degree swing of the boom it takes about one minute to complete one cycle. The dragline crew consists of two operators. One operator sits at the control station while the other makes routine maintenance checks inside the machine. The two operators rotate positions every hour to break the monotony and maintain their sharpest concentration.

The dragline is all electric and is powered by electricity through a large cable that connects to the local utility power system of Golden Valley Electric Association. When the dragline was first connected, the utility power plants could not accommodate the large power swings of the dragline (6-megawatt draw when digging and 2-megawatt regeneration when the bucket was extending). The electrical turbine generators could not keep up with the rapid and large power swings every 60 seconds, causing lights to flicker and other problems. Thus, UCM had to find a way to dampen the power swings.  A 40-ton flywheel system was developed and installed to run electrically parallel to the dragline. This system, called a "Peak Shaver," was installed in a separate building and connected to the same electrical power line as the dragline. During normal operations, the dragline executes three motions: drag, hoist, and swing every cycle (60 seconds).

When the dragline is dragging the bucket to fill with dirt and hoisting and swinging to dump the load, it demands large amounts of electrical power. After dumping the dirt on the spoil pile and swinging back into the pit for the next load, the dragline generates power as it electrically slows down the swing motion and lowers the bucket. The "Peak Shaver" trades power with the dragline as it operates, slowing down and generating power when the dragline is drawing power, and speeding up and drawing power as the dragline is generating power. This isolates the utility power system from the large power swings of the dragline.
The fourth motion of the dragline is the walking motion. Its movement is accomplished by lowering the float-like "shoes" on each side of the dragline and lifting the back. As the "shoes" go through a 60-second cycle, they drag the entire machine backward seven feet and then lower it to the full down position on the ground.

Coal and overburden are moved by large trucks affectionately called "yellow iron."  The haul trucks are each capable of a 150-ton cargo load. The Caterpillar 785 trucks weigh 250,000 pounds empty and 550,000 with a full load. Because coal is less dense than the dirt these trucks are designed to transport, UCM maintenance crews add the tailgates in order to accommodate a larger volume of material. UCM applies a local modification to the beds by adding an extra foot in width to each side of the box to accommodate the increased volume of coal. These modification increase productivity and are an economic advantage to operations. The engine exhaust on the trucks is modified at the factory to run through the beds and keeps the metal surface heated during the winter. This modification prevents freezing of the warm moist overburden or coal to the bed in the unique Alaskan winter environment.


 
UCM “Yellow Iron” includes:
 

Excavators:

 
Bucyrus-Erie 1300W walking dragline,
33 c.y.*
 
O&K RH170 shovel, 26 c.y.  
O&K RH120C backhoe, 16 c.y.  
Caterpillar 992G wheeled loader, 16 c.y.  

Caterpillar 994D wheeled loader, 26 c.y.

 

Caterpillar 966F wheeled loader, 5 c.y.

 
Volvo L330 wheeled loader, 4.5 c.y.  

Komatsu PC400-LC backhoe

 

Hitachi EX150LC backhoe

 
 
* cubic yards (c.y.)
 
     
Drill:  
Drilltech D60K21, tracked drill  
Ingersoll Rand DMM-2, tracked drill  
Terex-Reedrill SKS-W, tracked drill  
       
Dozers:  
Caterpillar D6M
 
Caterpillar D9N  
Caterpillar D10N  
Caterpillar D10R  
Caterpillar D11R-CD, carry dozer  
Komatsu: 475A-5  
       
Trucks:  
Caterpillar 785, 150-ton (6)
 
Dresser Haulpak, 95-ton  
Caterpillar D350E, articulated,
six-wheeled truck, 35-ton
 
       

Tipple:

Storage capacity: 6,000 tons

Rail loading capacity: 2,800 tons/hour

Crushers -700 tons/hour

   Primary: feeder-breaker (-8")
   Secondary: double-roll (-2")
Twin double deck - Svedala coal screen
Highway truck load-out system

On-line coal ash analyzer

     
     
     
Road Maintenance:
Caterpillar 16G, grader
Caterpillar 16H, grader
Water truck 75C, 75-ton, 14,000-gallon
Water truck 325M, 95-ton, 18,000-gallon
     

Support Equipment:

Low Boy: Kenworth off-road tractor with 250 ton low-boy trailer
Bucyrus Erie 61-B, 150-ton crane
PNH, 65-ton, all-terrain crane
Kenworth C500B, fuel service truck
A variety of light and medium-duty service trucks
     
     
     
     
     
     
     